To make a fake sun as a source of energy, 4 halogen lamp is used in this project. The wiring for the lamp is done in this week. The connection of the lamp is in series. All for lamp is place at the top of the stucture properly. After finish the wiring, the lamp is tested.
Tuesday, 5 November 2013
Wednesday, 30 October 2013
Constructing the structure
Activity
We are using an angle bar to be used as the based structure of the project. The angle bar is cutted using the grinder according to the desired length. The structure is combined by using a bolt and nuts. The cutting is being done with extra cautious as it involve sharp materials. A safety aspect is really important in this part.
We are using an angle bar to be used as the based structure of the project. The angle bar is cutted using the grinder according to the desired length. The structure is combined by using a bolt and nuts. The cutting is being done with extra cautious as it involve sharp materials. A safety aspect is really important in this part.
Wednesday, 16 October 2013
Testing the solar panel
Activity:
- Testing the Solar Panel
Objective:
- To make sure this Solar Panel are functioned.
- Measure the output value from the Solar Panel (directly without any circuit). Measure the voltage and current output produced from the Solar Panel using Multimeter.
- Determine the maximum performance using this Solar Panel. To produce the max output, test the Solar Panel at shining day.
The solar Panel will produce the different output power depending on the brightness of the light. For this testing, not use sunlight, but change the sunlight with brightness of the lamp.Solar Panel can be operating when we expose to brightness of the lamp and there will give the electricity output. from this testing we can analyzed that the more brightness apply at the PV, the more output value will be get.
Thursday, 10 October 2013
Testing the thermoelectric
Activity:
In this week, the thermoelectric is being tested. It is done to make sure this Thermoelectric Module are functioned. After that, measure the output value from the Thermoelectric Module using Multimeter. Determine the maximum performance using this Thermoelectric Module. To produce the max output, give the largest different temperature on each side of the Thermoelectric Module.
Wednesday, 2 October 2013
Week 4
ACTIVITY:
OBJECTIVE:
For this week progress, the solar panel and thermoelectric module have been purchased at Jalan Pasar. Measuring equipment and tools also have been purchased.
For the thermoelectric module, this component converts the heat into electricity and the output maybe approximately around 10mV~50mV.
- Project Progress
- Buy the project materials.
OBJECTIVE:
- Buy the solar panel.
- Buy thermoelectric module.
For this week progress, the solar panel and thermoelectric module have been purchased at Jalan Pasar. Measuring equipment and tools also have been purchased.
The specification for this solar panel is:
- Max output power: 5W
- Vmp: 16.8V
- Imp: 0.3A
- Voc: 21V
- Isc: 0.38A
- Dimension: 254 x 294 x 25
Thursday, 19 September 2013
Week 2
ACTIVITY
The task is to find the hardware and equipment for the project. After short listed the items, the component and tools are being located at Jalan Pasar shop. Some material need to get at hardware shop for example wire for the lamp.
OBJECTIVE
- Check and get related tools for the FYP project
- For the component and tools can get at the Jalan Pasar shop.
- Some material need to get at hardware shop for example wire for the lamp.
- Planning the progress of this project carefully to get best product and result
- The FYP progress should contains the step below:
- Idea and project the title.
- Project preparation.
- Concept development and testing.
- Project development and testing.
- Final preparation.
- At the end of next week the equipment and tools have been buy and all the raw materials related to this project also have classified.
Friday, 13 September 2013
Week 1
Activity
-We are asked to attend a Final Year Project (FYP) briefing at TTL2. The meeting is done to let the students know about the new agenda in FYPII. All the needs to complete the FYP is being brief in this meeting. On this week also, the component that will be used is being listed. The main component is the photovoltaic and the thermoelectric modules.
-We are asked to attend a Final Year Project (FYP) briefing at TTL2. The meeting is done to let the students know about the new agenda in FYPII. All the needs to complete the FYP is being brief in this meeting. On this week also, the component that will be used is being listed. The main component is the photovoltaic and the thermoelectric modules.
Subscribe to:
Posts (Atom)